Section 7A · Pages 155–160 (6 pages)

Automatic Transmission

From the 1975 Chevrolet Light Truck Service Overhaul Supplement

On-truck service for the Turbo Hydra-Matic 350 and 400/475: vacuum modulator assembly, maintenance and adjustments, transmission fluid, G-series column shift linkage, the manual shaft and range selector linkage, and transmission replacement for L-6 and V8 engines.

Read this section free, starting at page 155

What this section covers

  • Turbo Hydra-Matic 350
  • Turbo Hydra-Matic 400/475
  • Vacuum modulator
  • Transmission fluid
  • G series column shift linkage
  • Transmission replacement
Year
1975
Models
C, K, G, P 10–30
Publication
ST-330-75
Pages
324

What’s inside

Service supplement

  1. 0General Information and Lubricationpp. 7–28
  2. 1AHeater and Air Conditioningpp. 29–32
  3. 1BBodypp. 33–36
  4. 2FrameFrame dimension charts for the 1975 C, K and P models, listing the reference dimensions model by model.pp. 37–40
  5. 4Rear Suspension and Rear Axlepp. 41–46
  6. 5Brakespp. 47–59
  7. 6Engine Mechanicalpp. 60–68
  8. 6MEngine Fuelpp. 69–130
  9. 6TEmission Control Systemspp. 131–134
  10. 6YEngine Electricalpp. 135–154
  11. 7AAutomatic Transmissionpp. 155–160
  12. 7MClutches and Manual Transmissionspp. 161–166
  13. 8Fuel Tank and Exhaust Systempp. 167–174
  14. 9Steeringpp. 175–182
  15. 10Wheels and Tirespp. 183–188
  16. 11Chassis Sheet MetalCK-series hood lock assembly, carburetor outside air inlet snorkels, rear fender and running board.pp. 189–190
  17. 12Electrical: Body and Chassispp. 191–196
  18. 13Radiator and GrilleRadiator replacement, grille service and the coolant recovery system.pp. 197–198
  19. 15Accessories (Cruise Master)pp. 199–210

Overhaul supplement

  1. 1Air Conditioning Compressor Overhaulpp. 213–226
  2. 4Rear Axle Differential OverhaulAxle application chart by model, type, capacity and ring gear size, and the one 1975 change, in the Dana 10-1/2 inch ring gear differential.pp. 227–228
  3. 5Brake Booster Overhaulpp. 229–234
  4. 6Engine Repair ProceduresIncreased piston-to-bore clearance for 1975 and camshaft alignment checking with V-blocks.pp. 235–236
  5. 6MCarburetor Overhaulpp. 237–258
  6. 6YStarting Motor and GeneratorStarting motor and solenoid changes (R terminal removed because of High Energy Ignition) and the 10-SI series 100 type generator.pp. 259–260
  7. 7AAutomatic Transmission Overhaulpp. 261–272
  8. 7MManual Transmission and Transfer Case Overhaulpp. 273–282
  9. 9Power Steering Pump OverhaulPower steering pump pulley removal and installation with tools J-25034 and J-25033.pp. 283–284

Specifications

  1. Specificationspp. 285–324