Section 7A · Pages 155–160 (6 pages)
Automatic Transmission
From the 1975 Chevrolet Light Truck Service Overhaul Supplement
On-truck service for the Turbo Hydra-Matic 350 and 400/475: vacuum modulator assembly, maintenance and adjustments, transmission fluid, G-series column shift linkage, the manual shaft and range selector linkage, and transmission replacement for L-6 and V8 engines.
Read this section free, starting at page 155What this section covers
- Turbo Hydra-Matic 350
- Turbo Hydra-Matic 400/475
- Vacuum modulator
- Transmission fluid
- G series column shift linkage
- Transmission replacement
- Year
- 1975
- Make
- Chevrolet
- Vehicle
- C/K Trucks, G Vans, Light Duty Trucks, P Forward Control, Trucks
- Models
- C, K, G, P 10–30
- Publication
- ST-330-75
- Pages
- 324
What’s inside
Service supplement
- 0General Information and Lubricationpp. 7–28
- 1AHeater and Air Conditioningpp. 29–32
- 1BBodypp. 33–36
- 2FrameFrame dimension charts for the 1975 C, K and P models, listing the reference dimensions model by model.pp. 37–40
- 4Rear Suspension and Rear Axlepp. 41–46
- 5Brakespp. 47–59
- 6Engine Mechanicalpp. 60–68
- 6MEngine Fuelpp. 69–130
- 6TEmission Control Systemspp. 131–134
- 6YEngine Electricalpp. 135–154
- 7AAutomatic Transmissionpp. 155–160
- 7MClutches and Manual Transmissionspp. 161–166
- 8Fuel Tank and Exhaust Systempp. 167–174
- 9Steeringpp. 175–182
- 10Wheels and Tirespp. 183–188
- 11Chassis Sheet MetalCK-series hood lock assembly, carburetor outside air inlet snorkels, rear fender and running board.pp. 189–190
- 12Electrical: Body and Chassispp. 191–196
- 13Radiator and GrilleRadiator replacement, grille service and the coolant recovery system.pp. 197–198
- 15Accessories (Cruise Master)pp. 199–210
Overhaul supplement
- 1Air Conditioning Compressor Overhaulpp. 213–226
- 4Rear Axle Differential OverhaulAxle application chart by model, type, capacity and ring gear size, and the one 1975 change, in the Dana 10-1/2 inch ring gear differential.pp. 227–228
- 5Brake Booster Overhaulpp. 229–234
- 6Engine Repair ProceduresIncreased piston-to-bore clearance for 1975 and camshaft alignment checking with V-blocks.pp. 235–236
- 6MCarburetor Overhaulpp. 237–258
- 6YStarting Motor and GeneratorStarting motor and solenoid changes (R terminal removed because of High Energy Ignition) and the 10-SI series 100 type generator.pp. 259–260
- 7AAutomatic Transmission Overhaulpp. 261–272
- 7MManual Transmission and Transfer Case Overhaulpp. 273–282
- 9Power Steering Pump OverhaulPower steering pump pulley removal and installation with tools J-25034 and J-25033.pp. 283–284







