Section 1B · Pages 33–36 (4 pages)
Body
From the 1975 Chevrolet Light Truck Service Overhaul Supplement
Body items that differ from the 1974 manual. For C-K models it shows the two styles of cowl vent valve, glass run channel adjustment on the rear side doors of models 06 and 03, the cloth rear door check strap, rear door striker and wedge adjustments and an added caution for endgate disassembly; for G models it shows the new rear door latches, strikers, wedges and adjustment dimensions.
Read this section free, starting at page 33What this section covers
- Cowl vent valves
- Rear side door glass run channel adjustment (models 06 and 03)
- Rear door check strap
- Striker and wedge adjustments
- Endgate disassembly caution
- G model rear door latches and strikers
- Year
- 1975
- Make
- Chevrolet
- Vehicle
- C/K Trucks, G Vans, Light Duty Trucks, P Forward Control, Trucks
- Models
- C, K, G, P 10–30
- Publication
- ST-330-75
- Pages
- 324
What’s inside
Service supplement
- 0General Information and Lubricationpp. 7–28
- 1AHeater and Air Conditioningpp. 29–32
- 1BBodypp. 33–36
- 2FrameFrame dimension charts for the 1975 C, K and P models, listing the reference dimensions model by model.pp. 37–40
- 4Rear Suspension and Rear Axlepp. 41–46
- 5Brakespp. 47–59
- 6Engine Mechanicalpp. 60–68
- 6MEngine Fuelpp. 69–130
- 6TEmission Control Systemspp. 131–134
- 6YEngine Electricalpp. 135–154
- 7AAutomatic Transmissionpp. 155–160
- 7MClutches and Manual Transmissionspp. 161–166
- 8Fuel Tank and Exhaust Systempp. 167–174
- 9Steeringpp. 175–182
- 10Wheels and Tirespp. 183–188
- 11Chassis Sheet MetalCK-series hood lock assembly, carburetor outside air inlet snorkels, rear fender and running board.pp. 189–190
- 12Electrical: Body and Chassispp. 191–196
- 13Radiator and GrilleRadiator replacement, grille service and the coolant recovery system.pp. 197–198
- 15Accessories (Cruise Master)pp. 199–210
Overhaul supplement
- 1Air Conditioning Compressor Overhaulpp. 213–226
- 4Rear Axle Differential OverhaulAxle application chart by model, type, capacity and ring gear size, and the one 1975 change, in the Dana 10-1/2 inch ring gear differential.pp. 227–228
- 5Brake Booster Overhaulpp. 229–234
- 6Engine Repair ProceduresIncreased piston-to-bore clearance for 1975 and camshaft alignment checking with V-blocks.pp. 235–236
- 6MCarburetor Overhaulpp. 237–258
- 6YStarting Motor and GeneratorStarting motor and solenoid changes (R terminal removed because of High Energy Ignition) and the 10-SI series 100 type generator.pp. 259–260
- 7AAutomatic Transmission Overhaulpp. 261–272
- 7MManual Transmission and Transfer Case Overhaulpp. 273–282
- 9Power Steering Pump OverhaulPower steering pump pulley removal and installation with tools J-25034 and J-25033.pp. 283–284







