Section 9 · Pages 175–182 (8 pages)
Steering
From the 1975 Chevrolet Light Truck Service Overhaul Supplement
Steering linkage and power steering: idler arm, pitman arm and tie rods, power steering belt adjustment for different engines including the P30 motor home and C10–30 with the 454 V8, the power steering pump and hoses, Hydro-Boost connections, the steering gear and special tools.
Read this section free, starting at page 175What this section covers
- Linkage assembly and tie rods
- Power steering belt adjustment
- Power steering pump and hoses
- P-series motor home installation
- Power steering gear
- Special tools
- Year
- 1975
- Make
- Chevrolet
- Vehicle
- C/K Trucks, G Vans, Light Duty Trucks, P Forward Control, Trucks
- Models
- C, K, G, P 10–30
- Publication
- ST-330-75
- Pages
- 324
What’s inside
Service supplement
- 0General Information and Lubricationpp. 7–28
- 1AHeater and Air Conditioningpp. 29–32
- 1BBodypp. 33–36
- 2FrameFrame dimension charts for the 1975 C, K and P models, listing the reference dimensions model by model.pp. 37–40
- 4Rear Suspension and Rear Axlepp. 41–46
- 5Brakespp. 47–59
- 6Engine Mechanicalpp. 60–68
- 6MEngine Fuelpp. 69–130
- 6TEmission Control Systemspp. 131–134
- 6YEngine Electricalpp. 135–154
- 7AAutomatic Transmissionpp. 155–160
- 7MClutches and Manual Transmissionspp. 161–166
- 8Fuel Tank and Exhaust Systempp. 167–174
- 9Steeringpp. 175–182
- 10Wheels and Tirespp. 183–188
- 11Chassis Sheet MetalCK-series hood lock assembly, carburetor outside air inlet snorkels, rear fender and running board.pp. 189–190
- 12Electrical: Body and Chassispp. 191–196
- 13Radiator and GrilleRadiator replacement, grille service and the coolant recovery system.pp. 197–198
- 15Accessories (Cruise Master)pp. 199–210
Overhaul supplement
- 1Air Conditioning Compressor Overhaulpp. 213–226
- 4Rear Axle Differential OverhaulAxle application chart by model, type, capacity and ring gear size, and the one 1975 change, in the Dana 10-1/2 inch ring gear differential.pp. 227–228
- 5Brake Booster Overhaulpp. 229–234
- 6Engine Repair ProceduresIncreased piston-to-bore clearance for 1975 and camshaft alignment checking with V-blocks.pp. 235–236
- 6MCarburetor Overhaulpp. 237–258
- 6YStarting Motor and GeneratorStarting motor and solenoid changes (R terminal removed because of High Energy Ignition) and the 10-SI series 100 type generator.pp. 259–260
- 7AAutomatic Transmission Overhaulpp. 261–272
- 7MManual Transmission and Transfer Case Overhaulpp. 273–282
- 9Power Steering Pump OverhaulPower steering pump pulley removal and installation with tools J-25034 and J-25033.pp. 283–284







