Pages 19–22 (4 pages)

Tachometer, Cable Assembly and RPM Sensor

From the Truck Installation Kit TRQ-32(V) Installation Instructions (TB 5-2520-551-24)

Models
M1028A1 (AN/TRQ-32(V) kit)
Publication
TB 5-2520-551-24
Pages
82

Installing the tachometer in the gauge panel, routing the W67 tachometer cable through the radio hole to the RPM regulator assembly, and running the W-67 cable to the sensor pickup at the harmonic balancer. Magnetic pickups are installed at opposite holes on the balancer with thread lock.

What this section covers

  • Gauge panel rivet removal
  • W67E1 and W67E2 connections to the RPM regulator
  • W-67 cable routing in the engine compartment
  • Magnetic pickups on the harmonic balancer
  • Thread lock application