Pages 5–9 (5 pages)
Introduction, Materials and Tools
From the Truck Installation Kit TRQ-32(V) Installation Instructions (TB 5-2520-551-24)
- Make
- Chevrolet, U.S. Military
- Vehicle
- CUCV (M1008/M1009), Military
- Models
- M1028A1 (AN/TRQ-32(V) kit)
- Publication
- TB 5-2520-551-24
- Pages
- 82
States the purpose of the bulletin: modifying the M1028A1 truck and installing the TRQ-32(V) kit, which can also be retained if a vehicle change-over is required. Two personnel are needed. Tables list materials required in addition to the kit, such as the speed control group, power take-off, reservoir and pump assemblies, hoses and tube assemblies, then materials supplied with the kit and the tools required.
What this section covers
- Purpose and personnel required
- Materials required in addition to the kit
- Materials supplied, by item number and part number
- Tools required, such as the 1-1/2 inch hole saw
Loading manual…





