Pages 11–18 (8 pages)
PTO Unit and PTO Actuator Cable
From the Truck Installation Kit TRQ-32(V) Installation Instructions (TB 5-2520-551-24)
- Make
- Chevrolet, U.S. Military
- Vehicle
- CUCV (M1008/M1009), Military
- Models
- M1028A1 (AN/TRQ-32(V) kit)
- Publication
- TB 5-2520-551-24
- Pages
- 82
Installing the power take-off (PTO) unit on the transfer case, including removal of the cover plate, then drilling the dashboard and firewall and routing the PTO actuator cable into the cab. It covers mounting the cable housing on the PTO assembly, setting the actuator arm and the control knob position, and attaching the cable at the actuator arm bolt.
What this section covers
- Removing the transfer case PTO cover plate
- Instrument panel cover and plastic collar removal
- Dashboard and firewall holes for the cable
- PTO actuator cable routing
- Cable housing and actuator arm bolt
- PTO control knob adjustment
Loading manual…





