Pages 13–17 (5 pages)
Wiring, Hoses and Controls
From the 1956 Chevrolet V8 Air Conditioning Installation Instructions
Steps 20 to 32: connecting the wiring harness and resistor, installing air hoses, reworking the heater control panel and blower switch, fitting the refrigeration control panel, routing the air inlet, idle and heat bowden cables, mounting the selector valve, air outlets and glove compartment.
What this section covers
- Wiring harness
- Insulated air hose
- Heater control rework
- Bowden cables
- Selector valve
- Air outlets
Loading manual…