Pages 9–12 (4 pages)
Cleaning, Inspection and Assembly
- Year
- 1953
- Make
- Oldsmobile, Rochester
- Models
- Rochester Model 4GC four-barrel carburetor
- Pages
- 15
Finishing bowl and throttle body disassembly, throttle lever removal, cleaning and inspection of parts, then assembly of throttle body, bowl and air horn, with float level adjustment (Gauge J-5399, 1-9/16 in.), float drop (2-1/4 in.) and choke valve spacing.
What this section covers
- Throttle body and levers
- Cleaning and inspection of parts
- Assembly of bowl and air horn
- Float level and float drop adjustment
Loading manual…







